Industrial · Large industry
AI batteries for large industry
For large industrial loads, three M125G261 cabinets in parallel add up to 375 kW and 783 kWh of storage. A single AI energy management system coordinates all three to shave peaks, use low prices and keep production running through grid outages.

Industrial-scale storage for large loads
For heavy industry, every point of energy saving is thousands of euros a year. Three M125G261 cabinets in parallel add up to 375 kW of power and 783 kWh of storage, coordinated by a single AI energy manager. The system buys energy in cheap hours, uses it in expensive ones, shaves production-line peaks and lowers contracted power and penalties.
You don't need solar panels. If you have large PV roofs, the system is compatible with all inverters and maximises self-consumption, storing solar production for the afternoon and night shifts.
With energy prices expected to rise sharply in the coming years and a grid that becomes overloaded at times of high demand, production continuity is as important as savings. With 783 kWh of backup, your critical processes, cold rooms and control systems keep running during outages.
The cabinets are installed indoors or outdoors, depending on the available space; we decide the location with our technicians and your head of maintenance after a study of your site. You don't have to start with everything: begin with one or two cabinets and reach three as your consumption grows, without replacing what is already installed. Everything is monitored from the cloud, with real-time data and alerts for your maintenance team.
Why an AI battery
375 kW of power
Enough capacity to cover the peaks of whole production lines.
783 kWh stored
Enough energy to shift entire shifts to cheap hours.
Central management
One EMS coordinates the three cabinets and is monitored from the cloud.
Business continuity
Backup for critical processes, cold rooms and control systems.
Solar PV integration
Maximises self-consumption from large solar roofs.
Grows with your business
All our batteries can be connected in parallel. Start with one or two M125G261 cabinets and reach three in parallel (375 kW and 783 kWh) as production grows, coordinated by a single energy manager. The cabinets can be installed both indoors and outdoors.
Frequently asked questions
How is it installed?
After a technical study of your site, with our technicians and yours.
Delivery time?
Confirmed in the quote, depending on availability and project.
Can we start smaller?
Yes. Start with one or two cabinets and expand later.
How to start
Upload your bill
A photo or PDF of your electricity bill.
Free assessment in 24–48 h
We send a proposal with the estimated savings.
Professional installation
By our certified installers, with electrical certificate.
Save up to 40%. Free assessment in 24–48 h.
Upload your electricity bill and we'll send your personalised proposal, free and with no obligation.
Upload your bill →